• Kevin O'Neill

Silicon Valley Project


Siefert Associates, LLC has prepared working drawings for the erection of rebar cages for two slurry wall shafts in support of The Silicon Valley Clean Water Front of Plant Project in Redwood City, CA for the Nicholson Construction Company. Using a combination of the Manitowoc 888 crawler crane auxiliary and main hosts, the rebar cages are tripped and lowered into their final positions. The rebar cages weigh over 30,000lbs and exceed 140ft in length. See the video of a rebar cage section being tripped.

#RebarCages

WHO WE ARE

WHAT WE DO

PROJECTS

CAREERS

LOCATIONS

NEWS

GET CONNECTED

Connecticut Office: 180 Church Street, Naugatuck, CT 06770                                                                                                   

New York Office: 188 East Post Road, White Plains, NY 10601                                                                                                                                            © 2017 by Siefert Associates, LLC ​