WHO WE ARE

WHAT WE DO

PROJECTS

CAREERS

LOCATIONS

NEWS

GET CONNECTED

Connecticut Office: 180 Church Street, Naugatuck, CT 06770                                                                                                   

New York Office: 188 East Post Road, White Plains, NY 10601                                                                                                                                            © 2017 by Siefert Associates, LLC ​

  • Kevin O'Neill

Bayonne Bridge Demolition – ACD/EIG, JV


April 2018: Siefert Associates, LLC continues to provide engineered lift plans for ACD/EIG, JV to remove concrete pier segments of the Bayonne Bridge. The piers are sawcut and then removed with a Liebherr LR1300SX crawler crane. Rigging holes are cored through the 10ft thick concrete pier as shown. Challenges include minimizing sawcutting by lifting large (>200k pieces) and maintaining headroom clearance to the active new bridge above.


39 views