Brooklyn Bridge - Franklin Square Structure

Location: Manhattan and Brooklyn, New York City
Contractor:
Koch Skanska
Status: Under Construction
                    
Brooklyn Bridge 1 Brooklyn Bridge 2 Brooklyn Bridge 3

The Brooklyn Bridge project consists of the rehabilitation of the approach spans and ramps as well as the painting of the entire bridge. The project began in January 2010 and is expected to be completed in 2014. Siefert Associates, LLC is playing a major role in the rehabilitation of the Franklin Square approach bridge. The scope of work includes the deck demolition, temporary deck panel design, new orthotropic deck erection and general construction engineering support.

« Previous Project                                                                                                                               Next Project »